Schematic map of the west GTA — approximate positions, not survey-accurate. Pins are coloured by Stage and numbered to match the table below.
Off this map / location to confirm
Filter by stage:
Listing
Stage
Owner
Size
Seating
Location
Condition
Overall
Notes / next actions
Stage: 🟣 ★ Top Prospect (chosen direction — not yet secured) · 🔵 Recon (early scouting / drive-bys) · 🟢 Engaged (in conversation, viewing or application in) · 🟠 Negotiating (terms / offer) · ⚫ Archived (won't work / ruled out / sold). Matches the Stage dropdown in the Google Sheet.
Ratings: ●●●●● = strong fit, ○ = weak — with a short reason under each. Size (floor area), Seating (can it hold 300–500), Location (approx. distance from Hwy 427 as the central artery), Condition (move-in vs. reno). Overall is the team's Rating out of 10 taken straight from the sheet.
School-board note: the Catholic/Peel schools have no auditoriums — gyms or cafeterias only, ~200 max — below the 300–500 target, so they're archived. Distances from Hwy 427 are approximate.
Ratings, stages, captions and map positions are an interpretation of the discussion, not official data — exact size, capacity and some addresses aren't confirmed. The Overall column mirrors the sheet's Rating /10. A snapshot for the committee (not auto-synced to the sheet).